Mount Rainier NP Fiber Optic Install
Posted
Sep 3, 2025
Due Date
Sep 17, 2025
Location
N/A, N/A, N/A
Description
https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=0ec22ec9c4d2454faa42db1a716767e3
AI Summary
Okay, here's a breakdown of the key project requirements gleaned from the provided documents, organized for clarity. I've focused on elements crucial for bidding, planning, and execution. **1. Project Overview** * **Project Name:** Mount Rainier National Park - Nisqually Entrance Fiber Optic Trenching & Installation * **Location:** Nisqually Entrance, Mount Rainier National Park * **Goal:** Install a single-mode fiber optic cable system between an existing fiber vault on WASDOT ROW and park facilities. This includes trenching, conduit installation, fiber cable installation, termination and restoration. * **Key Components:** * Trenching & Conduit Installation * Fiber Optic Cable Installation (24-fiber SM cable between buildings, 6-fiber SM to individual buildings) * Fiber Termination & Splicing * Site Restoration * **Contract Type:** Lump Sum (payment based on completed work, with mobilization/demobilization costs distributed across line items). **2. Schedule & Timing** * **Work Start Date:** No on-site work allowed before September 1, 2025 (due to bird nesting). * **Project Completion Date:** Must be completed by December 15, 2025. * **Work Hours:** Typically 7:00 AM to 5:30 PM, Monday-Friday. Weekend/holiday work possible with approval. **3. Site Access & Restrictions** * **Traffic Control:** Maintain at least one open lane of traffic in public access areas if needed. * **Site Access:** Generally straightforward, with access to buildings/server rooms requiring coordination. * **Environmental Considerations:** Bird nesting is a critical concern influencing the start date. * **Existing Utilities:** Careful avoidance and potential relocation of existing utilities. **4. Submittal Requirements (Prior to Pre-Construction Conference)** * Letter designating Project Superintendent * Construction Schedule * Comprehensive Breakdown of Schedule of Values * Accident Prevention Plan * List of Subcontractors * SF1413 forms from subcontractors certifying labor standard compliance * Proof of Liability Insurance and Worker's Compensation * Quality Control Plan * **Submittal Method:** All submittals must be transmitted using National Park Service form CM-16. **5. Project Meetings** * **Pre-Construction Conference:** Required before work starts. (Topics listed in detail – roles, safety, coordination, contract terms, submittals, etc.) * **Progress Meetings:** Weekly or bi-weekly, facilitated by the Contractor, after work commences. **6. Key Technical/Construction Requirements** * **Trenching:** Potentially some hand digging to minimize vegetation damage. * **Conduit:** 4" Schedule 40 PVC. * **Fiber Optic Cable:** 24-fiber SM cable, 6-fiber SM to individual buildings. * **Termination:** Terminations in server room/building entries/wall-mounted boxes. * **Restoration:** Full site restoration to original condition. * **Utility Locates:** Contractor responsible for locating existing utilities before digging. **7. Contractual/Administrative Requirements** * **CM-16 Transmittal Form:** Mandatory for all submittals. * **Payment:** Lump Sum. * **Change Orders:** (Not detailed, but implied as standard). * **Reporting:** Payroll reports. **Important Considerations for Bidding/Planning:** * **Tight Schedule:** The timeframe between September 1 and December 15 is relatively short, requiring efficient planning and execution. * **Environmental Sensitivity:** The bird nesting restriction is critical and must be factored into the schedule. * **Site Access:** Limited access may affect equipment mobilization and material delivery. * **Submittal Requirements:** Prepare all required documentation well in advance of the Pre-Construction Conference. * **Lump Sum Contract:** Accurate cost estimation is crucial. Let me know if you'd like me to elaborate on any of these points or focus on a specific area.
Details
- Notice ID
- 0ec22ec9c4d2454faa42db1a716767e3
- Solicitation Number
- 140P8325R0024
- NAICS Code
- 238210
- Classification Code
- N099
Want to track opportunities like this?
Sign up for Kontratar to get AI-powered opportunity matching, ranking, and alerts.
Get Started FreeRelated opportunities
- Electrical Substation Maintenance and Repairs
DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.MISSION INSTALLATION CONTRACTING COMMAND.419TH CSB.W6QM MICC-FORT BUCHANAN (RC)
- 129 CS - Telecomm Conduit Install
DEPT OF DEFENSE.DEPT OF THE ARMY.NATIONAL GUARD BUREAU.JFHQ USPFO CA.USPFO CA PROCUREMENT.W7MX USPFO ACTIVITY CAANG 129
- Z1DA--Project No. 583-22-106- Replace Electrical Panels & Expand Distribution.
VETERANS AFFAIRS, DEPARTMENT OF.VETERANS AFFAIRS, DEPARTMENT OF.250-NETWORK CONTRACT OFFICE 10 (36C250)
- Inspect and Repair of 13.2KV Main Switchgear
HOMELAND SECURITY, DEPARTMENT OF.US COAST GUARD.USCG ACADEMY
- 657A5-26-111, Triennial Electrical Testing
VETERANS AFFAIRS, DEPARTMENT OF.VETERANS AFFAIRS, DEPARTMENT OF.255-NETWORK CONTRACT OFFICE 15 (36C255)
- H361--LEX Triannual Energy Study and ARC Flash Testing
VETERANS AFFAIRS, DEPARTMENT OF.VETERANS AFFAIRS, DEPARTMENT OF.249-NETWORK CONTRACT OFFICE 9 (36C249)
- Repair gates and limit switches to feedmill in Miles City, MT
AGRICULTURE, DEPARTMENT OF.AGRICULTURAL RESEARCH SERVICE.USDA ARS AFM APD
- J059--FY27 Building 1 Circuit Tracing Services
VETERANS AFFAIRS, DEPARTMENT OF.VETERANS AFFAIRS, DEPARTMENT OF.248-NETWORK CONTRACT OFFICE 8 (36C248)