U.S. ARMY 63RD READINESS DIVISION MILCON ERCIP MICROGRID
Posted
Jun 1, 2026
Due Date
Jun 29, 2026
Description
https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=56dc8525d97146ab9b6808efee2b416b
AI Summary
The solicitation (W9123826RA016) seeks proposals for the front‑end microgrid project. Offerors must submit two separate electronic PDFs: a Technical Volume (max 15 pages) and a Price Volume (no page limit). Each volume must include a title page with the solicitation number, project title, location, and offeror’s name, address, CAGE code, email and telephone, plus a table of contents. The Technical Volume is organized into tabs that correspond to the evaluation factors; Tab 3 must contain a Schedule Narrative that describes the construction, commissioning and close‑out sequence, includes a simple bar chart or P6 schedule with key activities, and demonstrates the offeror’s ability to meet the contract duration. The Price Volume must follow the FAR‑required cover sheet (items 1‑13) and include any required performance and payment bonds, an offer guarantee, and the standard Form 1442. Key compliance points: inquiries are due 14 calendar days before the proposal deadline; all solicitation documents and amendments are posted on PIEE and it is the offeror’s responsibility to monitor updates. The contractor must begin performance within the timeframe specified in Item 12a and submit an initial project schedule for Government approval within 42 calendar days after a notice to proceed, with mandatory monthly schedule updates thereafter. Offers that contain conflicting terms, lack the required cover‑sheet items, or fail to provide the schedule narrative and bonding information will be deemed unacceptable.
Details
- Notice ID
- 56dc8525d97146ab9b6808efee2b416b
- Solicitation Number
- W9123826RA016
- NAICS Code
- 237130
- Classification Code
- Y1MG
Want to track opportunities like this?
Sign up for Kontratar to get AI-powered opportunity matching, ranking, and alerts.
Get Started FreeRelated opportunities
- Electrical Projects – Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Request for Information
DEPT OF DEFENSE.DEPT OF THE AIR FORCE.AIR FORCE GLOBAL STRIKE COMMAND.FA9401 377 MSG PK
- Y1AZ--504-21-703 Training and Admin Support Space Construction
VETERANS AFFAIRS, DEPARTMENT OF.VETERANS AFFAIRS, DEPARTMENT OF.257-NETWORK CONTRACT OFFICE 17 (36C257)
- USFK C4I Communication Tower and Facility Maintenance CY27
DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.ACC-OO.411TH CSB.0411 AQ HQ CONTRACT AUG
- Notice of Cancellation of Solicitation- Building refurbishment in Hutchinson, KS at the HTI ARSR
TRANSPORTATION, DEPARTMENT OF.FEDERAL AVIATION ADMINISTRATION.6973GH FRANCHISE ACQUISITION SVCS
- FY27 San Francisco District Maintenance Dredging
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTH PACIFIC.ENDIST SAN FRANCISCO.W075 ENDIST SAN FRAN
- Y--Folsom Dam Electronic Access Control and Surveillance (EACSS) Fiber Backbone Up
INTERIOR, DEPARTMENT OF THE.DEPARTMENTAL OFFICES.RECLAMATION CONTRACTING ACTIVITY
- B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTHWESTERN.ENDIST FT WORTH.W076 ENDIST FT WORTH
- P210 ELECTRIC POWER PLANT AND ELECTRICAL DISTRIBUTION SYSTEM AT CHABELLEY AIRFIELD, DJIBOUTI
DEPT OF DEFENSE.DEPT OF THE NAVY.NAVFAC.NAVFAC ATLANTIC CMD.NAVFACSYSCOM ATLANTIC