Kontratar

MOTCO Rail Curves Package 2

SAM
N/A
Solicitation

Posted

Oct 7, 2025

Due Date

Nov 6, 2025

Description

https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=b350d0dd8b5345929c426c96d6d01032

AI Summary

The US Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a requirement for the MOTCO Rail Curves Package 2, which involves the removal and replacement of existing railroad curves at the Military Ocean Terminal Concord (MOTCO) in Concord, CA. The project includes the reconstruction/replacement/demolition of approximately 7500 linear feet of rail, including repairs or replacement of ties, rails, and other track hardware at multiple rail curves on the tidal side of the installation. The base bid package includes repair by replacement of curves 6, 11, and 12 (curvature less than 12 degrees) and demolition of curves 4 and 5. Curve 19 is an optional repair by replacement with connection to a UPRR-owned mainline siding. Tracks will be constructed per standards in UFC 4-860-01FA and AREMA Manual for Railway Engineering. The response deadline is November 6, 2025.

Details

Notice ID
b350d0dd8b5345929c426c96d6d01032
Solicitation Number
W9123826BA002
NAICS Code
237990
Classification Code
Z2LB

Want to track opportunities like this?

Sign up for Kontratar to get AI-powered opportunity matching, ranking, and alerts.

Get Started Free

Browse all federal contract opportunities