MACC for DB/DBB new construction, renovation, alteration and repair for large general, industrial and waterfront construction projects primarily located at PNSY, Kittery ME and NNSY, Portsmouth VA in support of SIOP
Posted
Dec 12, 2025
Due Date
Mar 7, 2026
Location
Kittery, Maine
Description
https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=c491aebbc73943e19190ad9c2f975cbb
AI Summary
The solicitation requires a contractor to execute a comprehensive waste‑characterization and remediation effort for a NAVFAC project at the Pacific Naval Shipyard (PNSY). Offerors must provide maps and diagrams showing waste origins, identify whether soils are on Installation‑Restricted (IR) or non‑IR sites, specify excavation depths, and estimate total waste volumes. The scope includes development and submission of a detailed sampling plan (subject to a minimum 14‑day Code 106.3 review), execution of sampling, analytical testing, and coordination of hazardous waste storage and disposal. Responsibilities are divided among NAVFAC (contractor interface), the shipyard (oversight, sampling logistics, and HWSF coordination), non‑shipyard personnel (field operations), an analytical laboratory (sample analysis and container provision), and the designated storage/disposal facility. Technical proposals must be written in English, contain specific, detailed responses to all data requirements, and include a description of the Operator Control Panel, controller, and software, as well as HP and FLA sizing for the control board. All required documentation—floor‑plan CAD files, equipment inventories, CPARS evaluation or Past Performance Questionnaire, and the Subcontracting Plan—must be submitted with the proposal, and any unmet small‑business subcontracting goals must be fully explained per DFARS 219.705‑4(d) and NMCARS 5219.705‑4(d). Unique compliance elements include the mandatory 14‑day review period for the sampling plan, the need to size the control board using HP and FLA calculations, and stringent small‑business subcontracting reporting with approval required one level above the Contracting Officer. The contractor must also deliver required forms and reports at least 90 days prior to occupancy, and ensure all equipment, floor‑plan, and waste‑management data are complete and accurate to enable government evaluation and acceptance.
Details
- Notice ID
- c491aebbc73943e19190ad9c2f975cbb
- Solicitation Number
- N6247026R0012
- NAICS Code
- 237990
- Classification Code
- Y1PZ
Want to track opportunities like this?
Sign up for Kontratar to get AI-powered opportunity matching, ranking, and alerts.
Get Started FreeRelated opportunities
- Y--Timucuan Ecological and Historic Preserve TIMU-335
INTERIOR, DEPARTMENT OF THE.NATIONAL PARK SERVICE.DSC CONTRACTING SERVICES DIVISION
- FY27 Euclid Creek Fishway Construction
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST BUFFALO.W072 ENDIST BUFFALO
- Pensacola Harbor Navigation Channel Maintenance Dredging
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTH ATLANTIC.ENDIST MOBILE.W074 ENDIST MOBILE
- Tampa Harbor Improvements Industry Day
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTH ATLANTIC.ENDIST JACKSONVILLE.W074 ENDIST JACKSNVLLE
- Y--Timucuan Ecological and Historic Preserve TIMU-335
INTERIOR, DEPARTMENT OF THE.NATIONAL PARK SERVICE.DSC CONTRACTING SERVICES DIVISION
- 2027-2029 Maintenance Dredging, Anchorage Harbor, Alaska
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION PACIFIC OCEAN.ENDIST ALASKA.W2SN ENDIST ALASKA
- Bonneville Powerhouse II Unwatering Pump Replacement
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST PORTLAND.W071 ENDIST PORTLAND
- Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance Dredging
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTH ATLANTIC.ENDIST WILMINGTON.W074 ENDIST WILMINGTON