Kontratar

Temporary Portable Steel Logging Bridge 40' Length X Minimum 12' Width, Andrew Pickens Ranger District at Sumter National Forest South Carolina

SAM
SBA
Solicitation

Posted

Sep 15, 2025

Due Date

Sep 24, 2025

Location

Mountain Rest, South Carolina

Description

https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=f1a95efd73e54825b04c6aac7d7c201f

AI Summary

This solicitation (12444125Q0088) seeks a temporary portable logging bridge with a 40-foot span and minimum 12-foot width for the Andrew Pickens Ranger District in South Carolina. The bridge must be all-metal construction with a modular panel design (maximum 7,200 pounds per panel), removable side rails, attachment points for loading/unloading, and minimum weight ratings of 70,000 pounds per axle and 100,000 pounds per vehicle. A professional engineer's stamp certifying the weight capacity is required. Offers must include a technical proposal addressing past performance and technical specifications, a price proposal (including completed SF1449), and representations and certifications (FAR 52.204-26, FAR 52.204-24 if applicable, FAR 52.209-7, and FAR 52.212-3). Submission is via email to ioulia.boxley@usda.gov by September 24, 2025.

Details

Notice ID
f1a95efd73e54825b04c6aac7d7c201f
Solicitation Number
12444125Q0088
NAICS Code
332312
Classification Code
5420

Want to track opportunities like this?

Sign up for Kontratar to get AI-powered opportunity matching, ranking, and alerts.

Get Started Free

Browse all federal contract opportunities